Sciweavers

ICMCS
2006
IEEE
119views Multimedia» more  ICMCS 2006»

Adaptive Multimedia Flow Regulation and Delay Analysis for End-Hosts in P2P Networks

16 years 17 days ago
Adaptive Multimedia Flow Regulation and Delay Analysis for End-Hosts in P2P Networks
This paper proposes a novel adaptive algorithm based on a new soft-regulator (σ, ρ, λ) for concurrent multimedia flows at end hosts. Our algorithm has the following features: (1) does requires the support of the network layers (routers and switches); (2) is scalable as it can be installed into any intermediated nodes for the delay control; (3) uses network resource efficiently, in particular, when the bandwidth of network is very limited. Performance experimental data have shown that (σ, ρ, λ) and related algorithm are efficient and applicable as compared with network layer solutions.
Weijia Jia
Added 11 Jun 2010
Updated 11 Jun 2010
Type Conference
Year 2006
Where ICMCS
Authors Weijia Jia
Comments (0)