Sciweavers

RTSS
2006
IEEE

Delay Analysis in Temperature-Constrained Hard Real-Time Systems with General Task Arrivals

16 years 2 months ago
Delay Analysis in Temperature-Constrained Hard Real-Time Systems with General Task Arrivals
In this paper, we study temperature-constrained hard realtime systems, where real-time guarantees must be met without exceeding safe temperature levels within the processor. Dynamic speed scaling is one of the major techniques to manage power so as to maintain safe temperature levels. As example, we adopt a simple reactive speed control technique in our work. We design a methodology to perform delay analysis for general task arrivals under reactive speed control with First-In-First-Out (FIFO) scheduling and Static-Priority (SP) scheduling. As a special case, we obtain a close-form delay formula for the leakybucket task arrival model. Our data show how simple reactive speed control can decrease the delay of tasks compared with any constant-speed scheme.
Shengquan Wang, Riccardo Bettati
Added 12 Jun 2010
Updated 12 Jun 2010
Type Conference
Year 2006
Where RTSS
Authors Shengquan Wang, Riccardo Bettati
Comments (0)