Sciweavers

196
Voted
TWC
2008
127views more  TWC 2008»

Energy-Delay Analysis of MAC Protocols in Wireless Networks

15 years 7 months ago
Energy-Delay Analysis of MAC Protocols in Wireless Networks
In this paper the tradeoff between energy and delay for wireless networks is studied. A network using a request-to-send (RTS) and clear-to-send (CTS) type medium access control (MAC) protocol is considered. We first determine the average delay incurred and the average energy consumed when the effects of an imperfect channel are incorporated in the model. In order to incorporate the relation between packet error probability, energy, and delay, we use the reliability function bounds on the error probability of a coded system. Further, we present a generic framework that allows us to obtain the joint statistics of energy and delay through their joint generating function. Several important design tradeoffs are studied from the joint generating function, such as the average energy with an outage delay constraint. This framework allows us to optimize over the system parameters for various objective functions, such as average delay. An approximation method is also proposed to calculate the a...
Shih Yu Chang, Wayne E. Stark, Achilleas Anastasop
Added 16 Dec 2010
Updated 16 Dec 2010
Type Journal
Year 2008
Where TWC
Authors Shih Yu Chang, Wayne E. Stark, Achilleas Anastasopoulos
Comments (0)