Sciweavers

5373 search results - page 171 / 1075
» Models and Motion Planning
Sort
View
ICPR
2004
IEEE
16 years 8 months ago
Learned Probabilistic Image Motion Models for Event Detection in Videos
Gwenaëlle Piriou, Jian-Feng Yao, Patrick Bout...
AIPS
2003
15 years 8 months ago
GPT Meets PSR
We present a case study in confronting the GPT generalpurpose planner with the challenging power supply restoration (PSR) benchmark for contingent planning. PSR is derived from a ...
Blai Bonet, Sylvie Thiébaux
WSC
1997
15 years 8 months ago
A Framework for Incorporating Dynamic Strategies in Earth-Moving Simulations
Earthwork projects involve moving specific amounts of earth from a discrete set of source locations to a discrete set of destinations. Constructors use different methods and equip...
Govindan Kannan, Julio C. Martínez, Michael...
ICAISC
2004
Springer
16 years 13 days ago
Strategic Planning through Model Checking of ATL Formulae
Model checking of temporal logic has already been proposed for automatic planning. In this paper, we introduce a simple adaptation of the ATL model checking algorithm that returns ...
Wojciech Jamroga
209
Voted
ISORC
2000
IEEE
15 years 11 months ago
Architecture, Design Methodology, and Component-Based Tools for a Real-Time Inspection System
We describe a real-time, component-based system for an inspection application. We chose the inspection application and the accompanying task (or scenario) so that we might fully e...
John Albert Horst